GI Earthings-Heavy Duty-80x3

GI Earthings 80x3 - Heavy

3E Solutions is GI earthings manufacturer in Jaipur, Rajasthan, as per JVVNL specifications tested in CPRI for 33kV substations and supplied to premium customers all across India. 

Gel Earthings by 3E Solutions

GI Earthings Heavy Duty- Maintenance free- 80×3-Price : 6200/ 

GI Earthings Specification :

1. Outer Pipe Length : 3 meter / 10 Feet with GI Pipe Make – Jindal

2. Outer Diameter : 88 mm : Thickness 4.0mm

3. Terminal – 50×6  mm Galvanised Iron (GI) : across the length

4. Primary Conductor : Galvanised Iron Strip50mmx6 mm Material between Primary and secondary conductor – Graphite based.

6. Backfill Compound – 2 Bags of 22 Kg each included.

3E Solutions is GI Earthings manufacturer and suppiers of  best GI Earthings in Jaipur and all over Rajasthan which has long life and superior electrical and thermal properties.

GI Earthings- 8-x3-Heavy- Commercial Terms and Conditions

1. Prices shall be finalised after knowing the final destination, Quanity and application of the use of the earthing.

2. The Prices, wherever quoted are exclusive of the Taxes / GST. 

3. Freight- Extra as actual

4. Delivery : 140 Pcs per week. The final delivery will be informed in offer only.

5. Payment Terms : 100 % Advance (Upto 140 Pcs). For more, 30% Advance and balance including taxes and transportation, before dispatch against PI.

6. Installation: Only upon confirmation by Labour supplier. Excluded in offer in general. Installation instruction on risks, safety, availability of water as laid in here below to be strictly adhared. 3E Solutions provide Earthing Installation service all over Rajasthan including Ajmer, Bhilwara, Kishangarh, Neemrana, Bhiwari and Jodhpur.

GI Earthings Installation Instruction

1. Pl premix the backfill compound with water before filling in the augured hole of size not below 8 inch. 

2. Cordinate with site owner/ site incharge for avoiding damage of Telecom/LT/HT electrical cables/Fibre optic lines/ sewerage / water etc lines

 3. Minimum interfering hemisphere of – 2 meter ( pref equal to length of pipe ) shd be mother earth all around the pipe for better results. Maintain safe distance from sewerage line / basement and try to avoid loose soil ( refilled ) .

4. The manual digging work is job of unskilled labour. In factory premises where there is risk of high voltage, chemicals, explosives etc, the earthing installation work must be supervised by customer side safety incharge. 

Safety - Precautions

1. Ensure no electrical, water , telecom or sewerage line below the site given for excavation. The manual work by labour to dig the hole involve sharp tools which may cut the cables and damage the pipe lines which may harm or cause civil liability. 

2 Ensure availability of water at the site required for premixing.

3. Pl inform if the mother soil is not available without using machine work like in the case of road, RCC or Pucca floor where we want to install the earthing.