3E Solutions is firstly maintenance free GI earthing electrodes manufacturer in jaipur. However, Specifications of GI Earthing Electrodes in Heavy Duty are as follows : 

1. Outer Pipe Length : 3 meter / 10 Feet : GI Pipe: Make – Tata

2. Outer Diameter : 56 mm : Thickness 3.0mm

3. Terminal – 40×5 mm Galvanised Iron (GI)

4. Primary Conductor : Galvanised Iron pipe dia 25 mm 

5 Material between Primary and secondary conductor – Graphite based.

6. Backfill Compound – 2 Bags of 22 Kg each included.

Maintenance Free GI Earthing Electrodes -Commercial Terms and Conditions

1. Prices shall be finalised in due time knowing the final destination, Quanity and application of the use of the earthing.

2. The Prices, wherever quoted are exclusive of the Taxes / GST. 

3. Freight is to be considered extra as actual.

4. Delivery : We can deliver upto 140 Pcs per week. The final delivery period will be informed in offer only.

5. Payment Terms : 100 % Advance upto 140 Pcs. For more quantity, 30% Advance and balance including taxes and transportation, before dispatch against PI.

6. Installation: Only upon confirmation by Labour supplier.

7 Excluded in offer in general. Installation instructions on risks, safety, availability of water as laid in here below should be strictly adhared. We of course provide earthing installation service in Jaipur and all over Rajasthan including Ajmer, Kishangarh, Neemrana, Bhiwadi and Jodhpur.

GI Chemical Earthing Electrodes -Installation Instruction

1. Pl premix the backfill compound with water before filling in the augured hole of size not below 8 inch. 

2. Cordinate with site owner/ site incharge for avoiding damage of Telecom/LT/HT electrical cables/Fibre optic lines/ sewerage / water etc lines

 3. Minimum interfering hemisphere of – 2 meter ( pref equal to length of pipe ) shd be mother earth all around the pipe for better results. Maintain safe distance from sewerage line / basement and try to avoid loose soil ( refilled ) .

4. The manual digging work is job of unskilled labour. In factory premises where there is risk of high voltage, chemicals, explosives etc, the earthing installation work must be supervised by customer side safety incharge. 

Safety - Precautions

1. Ensure no electrical, water , telecom or sewerage line below the site given for excavation. The manual work by labour to dig the hole involve sharp tools which may cut the cables and damage the pipe lines which may harm or cause civil liability. 

2 Ensure availability of water at the site required for premixing.

3. Pl inform if the mother soil is not available without using machine work like in the case of road, RCC or Pucca floor where we want to install the earthing.